• ₹ 50/SCM

 

  • Sr. NoParticulars Charge
  • 1 Application Charges Rs. 750 + 18% GST (9%CGST + 9%SGST)
  • 2 Security Deposit for connection Rs. 5000/- per registration (Rs.4500/- at the time of registration and balance Rs.500/- to be paid in first bill.)
  • 3 Gas Consumption Security Deposit* Rs. 1000/-
  • 4 Re-Connection Charges (PNG Supply is disconnected from inside with Red Lock) Rs. 1,628/- + 18% GST (9%CGST + 9%SGST)
  • 5 Re-Connection Charges (In case PNG Supply is disconnected from outside of the customers  premise) Rs. 4230 + 18% GST (9%CGST + 9%SGST)
  • 6 Permanent Disconnection Charges 1.Rs.1800/- for Dadar to Bhayander, Powai Chandivali, The contract is valid from 01.09.2023 to 31.08.2024 .PD charges will also include +18% GST per connection additionally. 2. Rs.900/- for Navi Mumbai, Kalyan, Dombivali, Ambernath, Badalapur, Raigad, Kalamboli, Panvel, Taloja, Thane. 3. Rs.743.50/- for Mulund to CSMT & Elphinstone road to Churchgate. The contract is valid from 16.07.2022 to 15.07.2024. PD charges will also include +18% GST per connection additionally.
  • 7 Name Transfer Charges Rs. 350 + 18% GST (9%CGST + 9%SGST)
  • 8 Cheque Bouncing Charges Rs. 200/-
  • 9 Minimum Monthly charges Rs.50 + 18% GST (9%CGST + 9%SGST) per month is charged. Bills are raised on Bimonthly basis.
  • 10 Delayed Payment Charges Rs. 100/- (for the payment not realized by MGL till the due date)
  • 11 Interest charges on Delayed Payment An interest of 18% p.a for the amount unpaid beyond 10 working days from the due date till the date of settlement of the payment or part thereof.
  • 12 Extra Copper charges beyond 5 meters a. Copper tube (straight) - Rs. 275/- per metre + 18% GST (9% CGST + 9% SGST) b. Copper tube (coil) - Rs. 325/- per metre + 18% GST (9% CGST + 9% SGST)
Price break-up

*Flexible Gas Consumption Security Deposit

  1. Every customer is required to furnish Security Deposit (SD) Rs.750/- towards gas consumption at the time of Application form submission or during the year when such demand is raised by MGL.
  2. At the end of each financial year, MGL will analyze the consumption of each customer and as and when the consumption is higher than the sum of Rs.750/- based on the average of Twelve Months equivalent six bills, based on which if the average Gas Sales is greater than the available security deposit, we shall raise differential demand on such customers in the bills of May and June every year as a onetime charge.
  3. The Differential SD shall be levied in multiples of Rs.100/-
  4. Failure to pay the Revised SD (Additional) will be considered as default and will be liable to disconnection.
  5. Further when disconnection is done, charges for Disconnection and Reconnection shall apply prior to reconnection being provided to the customer.